Photos by Greg Wilson Photography

Project Responsibilities

Planning:
  • Perform field run topographic data and physical features for asbuilts of building facades, valves, culverts, trees, edge of pavement
  • Locate underground utilities such as gas, electric, water, telephone
  • Demolition Plan
  • Rough Grading Plan to determine the impact of grading, sight distance and utility relocations
  • Site plan for the road extension and parking lot addition, including on-site storm sewer, grading, and interior parking
  • Systems Design for detention of increased storm runoff
  • Adequate outfall analysis for storm drainage
  • Construction Discharge Permit in accordance with Department of Environmental Quality Regulations
  • Site Lighting Plan showing the lighting required for interior and peripheral parking lots
  • Plan to show the transformer locations and the underground conduit with specified type, size, and length of the pipes
  • Overall Landscape Plan showing open space areas, buffers, vegetated areas, and undisturbed floodplains also including the necessary calculations and tabulations to indicate that adequate tree canopy coverage.